Dirt Road Construction Quotes

Get Professional Services

Cost of Dirt Road Construction in Englewood

Englewood, CO, is a vibrant community with diverse infrastructure needs, including the construction of dirt roads. Understanding the cost of dirt road construction in this area involves several factors and common tasks. This guide provides insights into the various elements that influence the overall expenses and a breakdown of typical costs associated with such projects.

Factors Affecting Cost

  • Soil Type: Different soil types require varying levels of preparation and stabilization.
  • Road Length and Width: Larger dimensions increase material and labor costs.
  • Topography: Hilly or uneven terrain may necessitate additional grading and excavation.
  • Drainage Requirements: Proper drainage systems prevent erosion and water damage.
  • Permits and Regulations: Compliance with local regulations can add to the cost.
  • Material Quality: Higher quality materials ensure durability but come at a higher price.
  • Labor Costs: Skilled labor rates in Englewood, CO, can vary based on demand and availability.

Average Costs for Common Tasks

Task Average Cost (per mile)
Grading and Excavation $5,000 - $15,000
Soil Stabilization $3,000 - $7,000
Drainage Installation $2,000 - $6,000
Base Material (Gravel) $10,000 - $20,000
Compaction $1,500 - $3,500
Finishing and Shaping $2,000 - $5,000
Total Estimated Cost $23,500 - $56,500

Understanding these factors and typical costs can help in planning and budgeting for dirt road construction projects in Englewood, CO.

Dirt Road Construction